Company profile
Contact details
We are doing following works in the Erection & Commissioning and civil construction works of which details are given as under below for your kind consideration please.


1Survey
2Foundation work / stub setting
3Stringing & sagging of ACR Zebra conductor & GSS wire
4Earthing of towers
5Benching & revertment work
6Tower & tower accessories
7Conductor & Ground wire
8Hardware fitting
9Testing of Conductor, GSS wire Hardware
10Ply wood Shuttering work
11Wter Proofinfa as per specification
12dments
13M-25 Foundation,
14M-30 Water retaining structures
15Miscellaneous
We are doing following works in the civil construction works of which details are given as under below for your kind consideration please.


1Excavation & Backfilling
2Reiforcements
3Steel Shuttering work
4Ply wood Shuttering work ...
5Wter Proofinfa as per specification
6dments
7M-25 Foundation,
8M-30 Water retaining structures
9Miscellaneous
We are doing following works in the civil construction works of which details are given as under below for your kind consideration please.
Detailed Abstract of Cost for Materil Contract for the Construction of 220 KV. S/C
Transmission Line on D/C Towers From N.N. to MADC
Sr. No.Description Provisional Quantity (Nos)Weight per Tower (Tonne)Unit Price Ex-works Excluding Taxes & Duties(Rs.) per tonneUnit Excise Duty (Rs.) per Tonne 16.48%Unit LST/CST(RS.per Tonne @2%Any other Taxes Levies (Rs.) Per TonneUnit freight (Rs) Per TonneUnit Insurance (Rs) Per TonneUnit Packing Forwarding Charges (Rs.) Per TonneUnit Unloading Charges at Destination Stores (Rs.) Per TonneConst of inland Delivery Final Destination Stores (Rs.) Per TonneTotal cost at Destination Store (Rs.)
ATowers & Accessories
1Fabrication and supply of 220 KV D/C galvnised steel towers extention including stubs and accessories
i)Tower Type B (TTB) Normal47.551,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,7531,972,600
ii)Tower Type C (TTC) Normal88.651,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,7534,523,829
iii)Tower Type D (TTD) Normal511.20351,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,7533,683,173
iv)Special tower (Assumed Weight)316.351,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,7533,215,338
v)220 KV line crossing gantries -1 set (Assumed weight) 18.651,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,753565,479
vi)132 KV line crossing crossing towerts & gantries -1 set (Assumed weight) 1951,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,753591,780
vii)3 M Full body Extn TTB11.29751,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,75385,282
viii)3 M Full body Extn TTC11.29751,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,75385,282
ix)3 M Full body Extn TTD11.58651,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,753104,285
x)6 M Full body Extn TTB12.31751,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,753152,350
xi)6 M Full body Extn TTC12.31751,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,753152,350
xii)6 M Full body Extn TTD12.75951,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,753181,413
xiii)1.5 M Full body Extn TTB10.2151,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,75313,808
xiv)1.5 M Full body Extn TTC10.2151,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,75313,808
xv)1.5 M Full body Extn TTD10.24651,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,75316,175
xvi)3 M Full body Extn TTB10.42151,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,75327,682
xvii)3 M Full body Extn TTC10.42151,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,75327,682
xviii)3 M Full body Extn TTD20.50651,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,75366,542
xix)6 M Full body Extn TTB10.87851,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,75357,731
xx)6 M Full body Extn TTC10.87851,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,75357,731
xxi)6 M Full body Extn TTD21.11851,0478,4131,189--5,105Inclusive Inclusive Inclusive 65,753147,024




Sr. No.Description Provisional Quantity (Nos)Weight per Tower (Tonne)Unit Price Ex-works Excluding Taxes & Duties(Rs.) per tonneUnit Excise Duty (Rs.) per Tonne 16.48%Unit LST/CST(RS.per Tonne @2%Any other Taxes Levies (Rs.) Per TonneUnit freight (Rs) Per TonneUnit Insurance (Rs) Per TonneUnit Packing Forwarding Charges (Rs.) Per TonneUnit Unloading Charges at Destination Stores (Rs.) Per TonneConst of inland Delivery Final Destination Stores (Rs.) Per TonneTotal cost at Destination Store (Rs.)

2Bolt , Nuts and washers for
i)Tower Type B (TTB) Normal40.378,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,32297,586
ii)Tower Type C (TTC) Normal80.3278,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,322208,184
iii)Tower Type D (TTD) Normal50.4378,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,322174,842
iv)Special tower (Assumed Weight)30.678,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,322146,380
v)3 M Full body Extn TTB10.03178,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,3222,521
vi)3 M Full body Extn TTC10.05978,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,3224,798
vii)3 M Full body Extn TTD10.06278,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,3225,042
viii)6 M Full body Extn TTB10.04178,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,3223,334
ix)6 M Full body Extn TTC10.08778,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,3227,075
x)6 M Full body Extn TTD10.178,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,3228,132
xi)1.5 M Full body Extn TTB10.0178,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,322813
xii)1.5 M Full body Extn TTC10.0178,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,322813
xiii)1.5 M Full body Extn TTD10.01478,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,3221,139
xiv)3 M Full body Extn TTB10.0278,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,3221,626
xv)3 M Full body Extn TTC10.0278,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,3221,626
xvi)3 M Full body Extn TTD20.02478,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,3223,903
xvii)6 M Full body Extn TTB10.04278,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,3223,416
xviii)6 M Full body Extn TTC10.04278,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,3223,416
xix)6 M Full body Extn TTD20.05278,904Inclusive Inclusive --2,418Inclusive Inclusive Inclusive 81,3228,457
3Design and destruction test of 220 KV D/C towers with 6M ext after allowing rebate for scrap value of steel of destroyed tower . (if required)
i)Tower Type B 1Lumpsum on Prorata basis3,000,0003,000,000
ii)Tower Type C 1
iii)Tower Type D 1
4Stub seting templet suitable for towers, full body extention and leg extention .
i)Tower Type B 11.15547,0247,7491,095--2,418Inclusive Inclusive Inclusive 58,28667,321
ii)Tower Type C 11.15547,0247,7491,095--2,418Inclusive Inclusive Inclusive 58,28667,321
iii)Tower Type D 11.15547,0247,7491,095--2,418Inclusive Inclusive Inclusive 58,28667,321
It is intimated that your offer for the construction pf 220 KV D/C transmission line on D/C towers from N.H. to MADC has been stated



The scope of this contract is for supply of material including design , enginering , manufacture and transportation at the price as per detailed abstract of cost )Annexure - I) The main abstract of cost is as under :



S.Np.DescriptionAmount (Rs.)Remarks

1Tower & Tower accessories
2Conductor & Ground wire
3Disc Insulators
4Hardware fittings
Total (Rs.)
Less discount (Rs.)
G. Total (Rs.)

5Test Charges for Conductors, GSS
Wire and Hardware fitting

Net Amount


The detaild price schedule is given at Annexure - I
Read more

  • Address
    MIDC.Hingna Nagpur Maharastra
  • Zip/Postal code
    440016
  • City/Region
    NAGPUR
  • Country
    India
  • Phonenumber
    +91-7104-232271
  • Faxnumber
    +91-7104-232271
  • Emailaddress
Type of construction
  • Other Construction Material
  • Agricultural Buildings
  • Transit Station Buildings
  • Highways, Streets & Roads
  • Bridges
  • Public Transport
  • Airports
  • Water Supply
  • Waste Management
  • Electric Power
  • Telecommunications
  • Commercial Buildings
  • Residential Buildings
  • Educational Buildings
  • Governmental Buildings
  • Industrial Buildings
  • Military Buildings
  • Parking & Storage Buildings
  • Religious Buildings
  • Power Transmission line